Confirm Installation Compliance Before Startup (Post-Construction)

Bath PSM compares the drawings in the “Issued For Construction (IFC)” package to the field installation for the specific process electrical equipment.  This check prior to the startup of the equipment ensures any corrections are made before the production unit is placed back in service reducing the impact on project cost and schedule and delays in output at the production site. 